Boskovice
Date of project/implementation: 2004/2004

- The completion and the reconstruction was designed in relation to the existing object.
- The reconstruction include changes which occurred with the change of use of the object and with the construction of the swimming pool.
- Reinforced concrete pool structure and the structure of water slides including top steel roof structure of the building designed as frame construction.







