Skip to main content

design/implementation: 2006/2006-2007

Nádražní, Šternberk

Nádražní, Šternberk

reconstruction of the footbridge num. L12

Repair of bridges, which is solved in this project documentation, consists of an exchange of damaged steel bridge elements, railing treatment, restoration of surface protection, the creation of new wood deck, design of new bearings and repair of concrete bridge abutments with materials of construction chemicals.